Everything it does
The whole mill, feature by feature.
This is the real list — the product’s own menus, one tool at a time. Nothing here is a “coming soon”. Buy one tool or run all four; you get exactly this.
LoomWatch
Live loom monitoringThe live floor8
- Every loom, liveGreen is weaving, red has stopped — the whole shed on one screen, updated every few seconds.
- Why a machine stoppedWarp break, weft break, stopped by hand — the cause, not just that it is down.
- Look-at-these-first shortlistThe stopped machines and the ones about to run out, ranked, above the grid.
- Speed and efficiency per loomRPM, shift efficiency and a target bar on every tile.
- Beam run-outMetres left and how long until it runs out, before it does.
- Machine groups and shedsOwner-named floor sections — by shed, by quality, by a fitter’s round.
- Tiles or list, search and filterFind a machine, filter to what needs attention, sort worst-first.
- Our count vs the machineThe loom’s own counter shown beside ours, as a cross-check.
Each machine, in full6
- The whole loom pageSpeed, efficiency, stops, beam, picks and yarn for one machine.
- Picks and shaft turnsBoth kept separate — a mismatch catches a wrong setting.
- Break rateWarp and weft breaks per lakh picks, the figure a master watches.
- How often it stops, how fast it restartsAverage run before a stop, and how long till it’s weaving again.
- The loom’s own screenOpen the machine’s touchscreen view from the office.
- Cameras on the machineA refreshing photo from the shed camera, where fitted.
Analysis7
- Efficiency over timeWhere production is heading — by hour, day or month.
- Where production is lostStop reasons ranked by time lost, or by how often.
- Worst-first rankingThe machines costing you most, so you fix the right one.
- Time-of-day heatmapWhen stops cluster across the day.
- How fast stops are attendedHow long a stopped loom waits before someone gets to it.
- Yarn and shift comparisonConsumption, and one shift against another.
- Coverage, stated honestlyWhat was and wasn’t recorded — a gap reads “not recorded”, never “idle”.
Reports6
- Twenty-plus reportsProduction, stoppages, speed, breaks, trend, hour-of-day and more.
- Grouped the way you askBy loom, shed, shift, quality, weaver or supervisor.
- Weaver scorecardEach person against the others on the sheet, fairly.
- Real Excel and PDFThe same report, three ways, that always agree.
- Saved viewsSet a report up once and open it the same way next month.
- The monthly owner summaryThe one page you open once a month and know by heart.
Alerts and WhatsApp4
- Alerts grouped sensiblyEleven machines with one problem is one message, not eleven.
- WhatsApp when a loom goes downThe group hears about a stop or a beam running out — no new app to learn.
- The shift reportA short summary to the group at the end of every shift.
- You set the limitsEvery colour and every threshold is your mill’s call, not ours.
Wall screen and setup5
- A wall-screen boardRotating pages sized for the office TV, set up once.
- Your own shift timingsOne to six shift starts, to the minute — not fixed shifts.
- Fabric templatesA library of qualities to copy onto a beam, never assumed.
- Per-machine targetsThe efficiency each loom is held to.
- Locked settingsThe tricky settings sit behind a service PIN, so nothing breaks by accident.
LoomLedger
Weaving ERP & GSTTransaction · Sales14
- Sale billTax invoice
- Sale register
- Sale return / credit noteCloth back, or a rate difference
- Delivery challanGoods out, bill later
- Challan returnSome of it came back before billing
- Total base challanOne agreed amount, no line rates
- Total base challan return
- Challan report
- Pending challansOut and not yet billed
- Order
- QuotationCommits nobody, and expires
- Gate passWhat left, and what is still out
- LR entryThe transporter lorry receipt
- Job workChallans in and out, and ITC-04
Transaction · Purchase11
- Goods purchaseYarn or stores bill
- Purchase register
- Purchase return / debit noteGoods back, or a rate difference
- Purchase challanGoods received, bill awaited
- Challan return
- General purchasePower, sizing, repairs — a bill with no item on it
- Total base challan
- Challan report
- Received, not billedWhat GRNI is carrying
- Purchase order
- Mill job / out jobBeams out for sizing or weaving
Transaction · Cash receipt3
- ReceiptCash in, matched to bills
- Auto cash receiptA lump sum spread over the oldest bills
- Receipt register
Transaction · Bank slip / receipt5
- Cheque receiptHeld, then banked, then cleared
- Bank receiptNEFT, RTGS, UPI
- Cheques in hand
- Returned cheques
- Reports
Transaction · Cash payment3
- PaymentCash out, matched to bills
- Auto cash payment
- Payment register
Transaction · Bank payment6
- Cheque paymentIssued, then presented, then cleared
- Bank payment
- Cheque return
- Passing reportWritten and not yet passed by the bank
- Reports
- Cash / bank transferContra: no party moves
Transaction · Journal voucher3
- One to oneOne debit, one credit
- Multiple JV
- Journal register
Transaction · Credit / debit note3
- Credit note
- Debit note
- Note register
Transaction · Opening entries10
- Opening balancesThe trial balance as the books open
- Opening balance report
- Opening inventoryThe godown on day one
- Opening sale bill
- Opening purchase bill
- Opening general purchase
- Opening credit note
- Opening debit note
- Advance receipt / paymentMoney with no bill against it yet
- Uncleared cheque entryOutstanding when the books opened; posts nothing
Transaction · Pending adjustment4
- Pending receiptsMoney in, not yet matched to a bill
- Pending payments
- Pending return adjustmentCredit notes naming no invoice
- Skipped in outstandingBills the mill has decided not to chase
Transaction · POS1
- Counter saleBill and money in one action
Manufacturing · Production receive5
- Production entryMetres off each loom, by shift
- Taka stock reportRolls by quality, grade and godown
- Taka mistakesWhat the folder marked down, worst first
- Roll entry & inspectionA roll entry IS the cloth inspection
- Machine masterThe office register. The monitored floor lives in LoomWatch
Manufacturing · Beam4
- Beam entryPrepare a beam, then mount it from its card
- Beam registerYield, yarn per metre and the sizing loss
- Beam cardOpen a beam on the register for its whole story
- Beam receive / issue (job)Beams sent out for sizing, and beams received to weave
Manufacturing · Job & inventory3
- Job work challan
- Still out at a job workerBeams and yarn somebody else is holding
- ITC-04
Manufacturing · Consumption6
- Define consumptionHow much yarn a metre of a quality should take
- Item
- Item + design
- Item + design + colour
- Item + lot no
- Stock journalA physical count, a transfer, wastage
Manufacturing · Stock5
- Stock on hand
- By godown
- By lot
- Below reorder level
- Yarn reconciliationIssued against what the looms consumed — a different question from the standard
Manufacturing · Stock entry6
- Physical countWhat the shelf holds. The one entry that outranks the book
- Godown transfer
- Wastage
- Other issue
- Stock journal register
- Opening stock
Manufacturing · Planning3
- Orders & deliveryWill we make Tuesday
- Design profitability
- Machine data & mapping
Manufacturing · Salary (LoomCrew)5
- Staff cost in the books
- Karigar masterPeople, rates and roles
- Day book & attendancePresence, machines and hours
- Advances (upad)
- Wage sheet
Master · Trade5
- PartiesCustomers, suppliers, agents, transporters
- Items & stock
- Yarn
- Grey fabric
- Stores & spares
Master · Factory2
- Looms
- Employees
Master · Books2
- Opening balancesThe chart of accounts, and what each one opened with
- Company
Config · Documents3
- Bill formatThe wording on each printed document
- Email formatThe words per document, with placeholders
- Whatsapp message formatSame templates, the WhatsApp channel
Config · Profiles2
- Email profileThe mill’s own mail host
- SMS profileThe gateway the mill pays for
Config · Year3
- Summary processIs there anything left undone
- Transfer / create new yearClose the year and carry the balances forward
- Opening entriesWhere a new installation begins
Config · Data import4
- Import itemsYarn, fabric and stores from a CSV
- Import accountsParties and ledgers
- Import transactionsPlain journals — tax and stock belong in the editors
- Import takaInspected rolls onto the shelf
Config · Setup3
- Advance setupThe company, its GST and its books dates
- User configurationWho signs in, kept once for the suite
- Audit clientsThe auditors, and the period each was given
Config · System4
- BackupWhat is backed up and where it goes
- Restore from backupThe one command that brings it back
- Check for updateWhat is running here
- Zap databaseRemove the transactions, keep the masters
Report · Day book register6
- Sale / purchase detailsEvery tax document, date by date, with the split
- Account detailsOne account, opening to closing
- Cash book
- Bank book
- Bank reconciliationWhat the statement should say, and why it does not
- Day bookEvery voucher, as entered
Report · Final reports6
- Trial balance
- Trading accountDown to gross profit
- Profit & loss account
- Balance sheet
- Opening + transactions + balanceSix columns per account
- Account wise balanceOne line per account
Report · Outstanding5
- Sale / purchase outstandingBill by bill
- Ageing outstandingBy party, by bucket
- Brokerage statementWhat each agent earned, and is owed
- Bill versus paymentHow long each bill actually took to be paid
- Interest report, bill wiseOnly where a rate was agreed
Report · GST10
- GSTR-1
- GSTR-3B
- GSTR-3B monthly summaryTwelve months on one screen
- GSTR-2 (inward supplies)
- GSTR-2B reconciliationInput credit the portal has and the books do not
- GST registers
- Credit / debit note report
- GSTR-9 (annual)
- GST refundAccumulated credit on zero-rated supplies
- ITC-04 (job work)
Report · Tax deducted2
- TDS reportWhat we deducted, and what was deducted from us
- TCS report
Report · Journals from a report3
- Interest report (account J.V.)Charge the interest, bill by bill
- Depreciation report (J.V.)Per asset, pro-rated by days held
- Fixed asset register
Report · Documents10
- Sale register
- Purchase register
- General purchase register
- Receipt & payment register
- Cheque register
- Challan report
- Pending challans
- Quotations
- Gate passes
- LR register
Report · Factory5
- Production
- Quality by machine
- Design profitability
- Order progress
- Yarn reconciliationIssued against what the looms consumed
Report · Trail2
- Audit trailWho changed what, and when
- Account zoomA year of one account by month, then drill in
Utilities · Control2
- Data freezeNo posting into a filed period
- Summary processIs there anything left undone
Utilities · Find2
- Transaction searchOne box over every dated document
- Query toolA read-only question, capped at 500 rows
Utilities · Tax1
- Tax separate resetRe-derive the tax the bills carry
Utilities · Data import1
- ImportItems, accounts, transactions and taka from a CSV
Utilities · Setup3
- Company
- Opening entries
- Machine data & mapping
Utilities · People1
- Employee cost
LoomCrew
People & wagesThe day book6
- A card per worker, per shiftThe paper day-book, as rows — what each person ran that day.
- Claimed vs confirmedWhat the worker said, and what you agreed — a struck-off machine shows up.
- Your nod makes the wageAn unagreed card pays a dash, never a zero, and says how many days are waiting.
- Two on one machine, caughtIf two people claim one machine, it is flagged and both are named.
- Piece counts tooThans folded, beams sized — a count for work no loom measures.
- Not everyone runs a machineThe folder, winder and sizer reach the wage sheet with a job and no machines.
Wages6
- By machineA base plus a rate per machine over the base — per person, per role.
- By piecePaid for metres the looms measured, over the shifts worked.
- By slabA table — four machines is 480, five is 620 — never guessed between.
- By dayA daily rate; half a day scales the base, not the machine count.
- No rate is ever guessedA rate nobody entered stays blank; zero is refused.
- Worked out per dayThe rate follows the job done that day, not one rate for the month.
Register and roster5
- AttendanceOne register, filled from the day cards — no second tick sheet.
- Leave and advancesIn one place, alongside the day book.
- Hours and overtimeRecorded on the card, straight onto the wage sheet.
- Who is on which machineToday’s roster, from the agreed cards — not a stale list.
- Mark a run of daysOne control fills the days that need no count, and names the rest.
People and settings3
- More than one job per personThe card’s job decides the rate; a person holds the jobs they can do.
- PIN sign-in and kioskSafe PINs that never leave the server; kiosk mode is off unless you turn it on.
- Rules you setCard per shift or per day, how far back a worker may correct, when a card is final.
LoomMarket
Job work between millsThe board3
- Job work on offerFiltered by process, area, rate and deadline; a blank rate is a dash.
- Give out workList what you cannot take in-house; applicants appear with their verified profile.
- Take on workApply with a message; the other side’s WhatsApp appears when they connect.
Trust4
- Verified factoriesEvery account is a Loomstack mill.
- Measured efficiency on the profileFrom LoomWatch, or a dash.
- Ratings after a dealBoth sides, once, after connecting.
- Private numbersShown only after you connect.
Buy one part on its own, or run the whole mill on all four.
See your own floor on one screen.
Tell us how many looms you run. We will show Loomstack working with your looms, your qualities and your language — no pressure, no lock-in.